At Fenchurch Group, our work in the oil, gas, and power sectors speaks for itself. Explore our key projects to see how we've driven innovation and set industry standards.
Technical Due Diligence for
Proposed Drilling Rigs Asset
Acquisition (>$200million)
(Completed) 2012
CIG Group Limited.
Technical Due Diligence on Proposed Investment in a Nigerian Oil and Gas Company (>$10million)
(Completed) 2014
Vantage Capital
Technical Due Diligence on a Proposed Mezzanine Investment in a Nigerian Oil and Gas Company (>$10million)
(Completed) 2015
Fidelity Bank Plc
Marginal Field Development Monitoring and Management Services (>$12million)
(Completed) 2015
Vantage Capital
Technical Due Diligence on a Proposed Mezzanine Investment in a Nigerian Oil and Gas Company (>$12million)
(Completed) 2017
Africa Finance Corporation
Technical and Commercial Due Diligence for Proposed Oil and Gas Asset Acquisition (>$150million)
(Completed) 2019
Africa Finance Corporation
Technical and Commercial Consultancy on Oil and Gas Asset Acquisitions
(Completed) 2020
Africa Finance Corporation
Technical and Commercial Consultancy on Oil and Gas Asset Acquisitions
(Completed) 2021
Fidelity Bank & Sahara Group
Technical and Commercial Due Diligence on OML 148 (>$19million)
(Completed) 2021
FBN Quest/ First E&P
Technical and Commercial Due Diligence on OML83 (>$20million)
(Completed) 2021
Fidelity Bank Plc/Triansel Gas
Technical Project Monitoring of 25,000MT LPG Storage Facility and Jetty (>₦6Billion)
(Completed) 2021
Fidelity/Green Energy-LekOil
Project Monitoring and Evaluation on otakipo Marginal Field Drilling Programme (>$15 million)
(Completed) 2022
Fidelity/ Hyde Energy
Technical and Commercial Due Diligence for Oil & Gas Asset Acquisition
(Completed) 2022
Fidelity/ Halkin
Atala 1 Crude Oil Production Volume, Storage, and Monitoring
(Ongoing) 2023
Fidelity/ Halkin
Atala 2 Drilling, Operations & Monitoring
(Ongoing) 2023
Fidelity/ Hyde Energy
Technical and Commercial Due Diligence for Oil & Gas Asset Acquisition
(Completed) 2023
Africa Finance Corporation
Oando-NOAC Proposed Acquisition (>$1Billion)
(Completed) 2023
InfraCredit Limited
Technical Due Diligence For the Development of LPG Hubs (>$3 million)
(Completed) 2024
Africa Finance Corporation
Technical and Commercial Consultancy on Oil and Gas Asset Acquisitions
(Completed) 2024
Power Holding Company of Nigeria
Engineering, Procurement, Installation, and Commissioning of 2 x 15MVA Injection Substation (Civil and Electromechanical Works) Ilesa, Osun State (>$2million)
(Completed) 2012
British American Tobacco
Supply and Installation of a 4.6mw Diesel Generator (>$1.5million)
(Completed) 2014
BPS Limited
Power Audit and Load Studies of the Proposed 8.5MW Asaba Independent Power Plant (>$1million)
(Completed)
2016
Asaba Distribution Limited
Conceptual and Front-End Engineering Design of the 11kv 25km Underground Distribution Network (>$1million)
(Completed)
2016
BPS Limited
Promoters of the Development of the 8.5MW Asaba Independent Power Plant (>$9million)
(Completed) 2016
Asaba Distribution Limited
Promoters of the Development of the Asaba 11kv 25km Underground Distribution Network (>$3million)
(Completed) 2019
Ekiti IPP Limited
Power Audit and Load Studies of the Proposed 5MW Ekiti Independent Power Plant (<$200,000)
(Completed) 2021
Olokiti Power Distribution Limited
Conceptual and Front-End Engineering Design of the Olokiti 11kv 12km Underground Distribution Network (<$200,000)
(Completed) 2023
(WAEP) & NLNG
Supply, Installation and Commissioning of MV Packaged Substations (>$250,000)
(Completed) 2021
Olokiti Power Distribution Limited
Developers of the Olokiti 11kv 11km Underground Distribution Network (>$3million)
(Completed) 2023
Ekiti Ipp Limited
Developers of the 5MW Ekiti Independent Power Plant (>$6million)
(Completed) 2023
Ikeja Electric
Supply of 500kVA 11/.400kV transformers (< ₦150 million)
(Completed) 2024
Eko Electricity Distribution Company
Engineering, Procurement, Installation of 11kV overhead distribution network (Civil and Electromechanical Works) Badore, Ajah, Lagos State
(Ongoing) 2024
Lagos State Ministry of Energy & Mineral Resourses (Concession)
Construction & Expansion of the Akute Independent Power Plant from 12MW to 26MW ($11million)
(Ongoing) 2026
Lagos State Water Corporation
Rehabilitation of Electrical Components at Adinyan, Iju & Akute Water Treatment Plants in Lagos ($500,000)
(Ongoing) 2026
Fenchurch group is an Africa-focused energy, power, and infrastructure conglomerate driven by the passion to bridge the energy gap of Africa.
Contact Us