Power Holding Company of Nigeria
Engineering, Procurement, Installation and Commissioning of 2 x 15MVA Injection Substation (Civil and Electromechanical Works) Ilesa, Osun State
(>$2million)
2012
British American Tobacco
Supply and Installation of a 4.6mw Diesel Generator
(>$1.5million)
2014
BPS Limited
Power Audit and Load Studies of the Proposed 8.5MW Asaba Independent Power Plant
(>$1million)
2016
Asaba Distribution Limited
Conceptual and Front-End Engineering Design of the 11kv 25km Underground Distribution Network
(>$1million)
2016
BPS Limited
Promoters of the Development of the 8.5MW Asaba Independent Power Plant
(>$9million)
2016
Asaba Distribution Limited
Promoters of the Development of the Asaba 11kv 25km Underground Distribution Network
(>$3million)
2019
EKITI IPP LIMITED
Power Audit and Load Studies of the Proposed 5MW Ekiti Independent Power Plant
(< $200,000)
2021
EKITI IPP LIMITED
Developers of the 5MW Ekiti Independent Power Plant
(> $6 million)
2021
OLOKITI POWER DISTRIBUTION LIMITED
Conceptual and Front End Engineering Design of the Olokiti 11kv 12km Underground Distribution Network
(< $200,000)
2021
OLOKITI POWER DISTRIBUTION LIMITED
Developers of the Olokiti 11kv 12km Underground Distribution Network
(> $3 million)
(On-Going)
2021
WEST AFRICA ENGINEERING PLANTS & NLNG LIMITED
Supply, Installation and Commissioning of MV Packaged Substations
(> $250,000)
(On-Going)
2021